---
url: "https://www.skedulo.com/industries/energy-solar/energy-storage-ev-charging/"
type: "page"
title: "EV Charger & Battery Storage Field Service | Skedulo"
description: "Schedule certified technicians for EV charger and battery storage installs, commissioning and repairs, and capture readings and signoff on mobile."
---

# Storage and charging service, planned around each site.

Schedule installation, commissioning and service across your network. Match technician qualifications to the job, with site requirements and outstanding work in view.

[Book a Demo](https://www.skedulo.com/book-a-demo/)

![Technician logging a charger check on a tablet at an EV charging site at dusk](https://assets.skedulo.com/uploads/hub-heroes/energy-storage-ev-charging-hero-photo-v1.webp)

## Trusted by teams that keep essential work moving.

- Achieve3000
- American Red Cross
- Connexin
- ECL Group
- Mainmark
- Rocket Fiber

_Who it's for_

## Site readiness is part of the service plan.

Commissioning can wait on equipment, access or a prior inspection. Those requirements stay with the job, so managers, dispatchers and technicians work from one list of what's outstanding.

_Runs the operation_

### Service manager

Review recurring visits and urgent requests across distributed charger and storage sites.

[Explore operations leadership](https://www.skedulo.com/solutions/operations/)

![Person in a work jacket holding a tablet beside a row of EV chargers in a parking lot](https://assets.skedulo.com/uploads/photo-library/stock/persona-energy-ess-runs-20261009a.webp)

_Plans the work_

### Dispatcher

Assess an urgent request against qualified capacity, travel and the day's existing visits.

[Explore scheduling and dispatch](https://www.skedulo.com/solutions/schedulers/)

![Office worker with a headset at a desk, a route map on the monitor](https://assets.skedulo.com/uploads/photo-library/stock/planner-dispatcher-arh-20261007a.webp)

_Does the work_

### Commissioning technician

Record test readings, checklist responses, photos and signatures on site in Skedulo Mobile.

[Explore frontline work](https://www.skedulo.com/solutions/frontline-workers/)

![Technician working at an open electrical panel](https://assets.skedulo.com/uploads/photo-library/home-services/hvac-electrical-plumbing/hep-05-b.webp)

_How it runs_

## Installation, commissioning and ongoing service.

_[ 01 ]_

### Service requirements

Site, asset, priority and service window define the request before a technician is assigned.

_Illustration: Skedulo card for the Microsoft Dynamics 365 integration: the Dynamics 365 logo, Connected, 2 data flows. Work order 72514, from a customer case, comes in from Dynamics 365 in real time and becomes JOB-4897 in Skedulo with its best match, Doug Lindqvist. Then the booking goes back: Doug Lindqvist, Friday at 9:00 AM, as a booking in Dynamics 365._

_[ 02 ]_

### Prerequisites and access

Parts needs, access arrangements and prior work are recorded with the visit. Your team confirms outstanding requirements before dispatch.

_Illustration: A Skedulo job panel for JOB-4821, an inverter replacement on unit 2, Wed 13 Aug, 2:00 - 3:30 PM, Gloria Benitez en route, open on its tasks: isolate and tag the supply and swap the faulty unit ticked done, then test and record readings and the site owner's sign-off still to do, with the job's details and resources folded below._

_[ 03 ]_

### Technician allocation

Match job requirements to recorded qualifications, availability, and route fit.

_Illustration: Skedulo scheduling objectives card, marked Active: three objectives in rank order - service level, keep every promised window; travel time, the shortest drive between jobs; resource use, fill each technician's day before adding one - and the rules a match must pass, licensed for the job type and within 25 miles of home base checked, overtime to close a gap left off_

_[ 04 ]_

### Commissioning and service records

Technicians complete your forms on site, recording readings, photos, notes and required signatures.

_Illustration: Skedulo Form Builder properties for Asset identifier, a text component on page 3, Asset and equipment inspection: Required switches on, then Barcode scanning; the validation rule is Matches pattern AST-####. In the test well a short tag, AST-115, is typed and the rule answers in red - Enter a tag like AST-1152 - and the last digit clears it: Matches AST-####_

_[ 05 ]_

### Urgent response

Qualified capacity, travel and existing commitments help dispatchers assess an urgent request against the rest of the day's work.

_Illustration: A slice of the Skedulo dispatch board for solar work - four technician lanes across a Denver afternoon, the now line at 1:24 PM. Gloria's meter swap runs past its end, her 2:00 PM inverter swap, JOB-4821, gets the rose overlap band - Gloria can't reach it by 2:00 PM - and the dispatcher drags just that card one lane down onto Doug Lindqvist, where it lands at 2:15 PM, and Helen Pryor is sent her new window. Then Bridget Hanley calls out, her lane is tagged Unavailable from 1:30 PM, and her one remaining job, the limiter retrofit, moves onto Aaron Feldman the same way._

_[ 06 ]_

### Asset and service history

Integrations can send completed work and outstanding actions to your asset, warranty and billing systems.

_Illustration: A Skedulo panel on a hatched ground: JOB-4803 completed Wed 13 Aug at 5:21 PM and sent where it is needed - the work order's status Completed back to Salesforce with Pass with Actions and follow-up JOB-4871, the completed work to Finance for invoicing, and Gloria Benitez's approved hours to Workday at 6:00 PM. Each row syncs in turn: 3 of 3 delivered._

_Tempo_

## Ask Tempo about service coverage.

Review requests, compare technician options and prepare assignments with Tempo, using the site records and actions enabled for your team.

[Meet Tempo](https://www.skedulo.com/product/tempo/)

_Illustration: Skedulo Tempo checking qualifications before a charger commissioning: JOB-4958 commissions two fast chargers for Pioneer Health Systems' patient transport vans tomorrow, and the charger maker's warranty needs a technician it certified; the installer booked isn't. The issue lands in amber on a blank screen and becomes the task's header; Tempo reads the job, certifications and site notes, and the context panel opens on the campus map and the commissioning visit. Tempo picks Adaeze Mensah, certified and free; once started, it books her, keeps Fiona Brennan as her second and emails Helen Pryor_

_Multi-site service_

## Service coverage across your network.

### Skills and certification matching

Match work requirements to the skills, certifications, and equipment access maintained in technician records.

_Illustration: Skedulo Tempo on a soft blue card. The dispatcher has asked, Hey Tempo, who can take Thursday's 22-panel install, and Tempo answers: Curtis is booked until 3:00 PM; Aaron also holds working at heights and is free from 8:00 AM. A slim strip under the answer shows Curtis's three jobs across his Thursday, and the message box waits for a follow-up._

### Readiness checks

Add the access, equipment and prerequisite fields relevant to your sites. Coordinators can review them alongside the scheduled visit.

_Illustration: Skedulo mobile Parts and materials page on an iPhone for JOB-4807, a battery retrofit on a garage wall: M10 is typed into the catalog search and three results come up with their stock; the stainless M10 wall anchor is added and counted up to four, $15.20, beside the 13.5 kWh battery module already on the job; a photo of the old fixings goes on the line, and Save puts 2 line items, $9,865.20 in parts, on the job._

### Commissioning records on Mobile

Record test readings, checklist responses and photos on site for your commissioning review.

_Illustration: A Skedulo mobile commissioning form card: Battery fault on start-up? is answered Yes in rose, and a dashed section opens with the approved escalation - call the commissioning lead before leaving - ticked as done, then the follow-up needed, a warranty check in 24 hours._

### Urgent service dispatch

Compare qualified technicians and travel against their existing visits before reassigning work.

_Illustration: A stack of Skedulo context cards on a soft blue card. The top card is Gloria Benitez, on Interstate 25 at Alameda Avenue: a street map with a red crash marker at the interchange and her photo pinned just south of it on the highway. Under the map: 2 impacted jobs, JOB-4821 and JOB-4803, and nearing overtime, 7h 34m of 8h._

### Connected asset records

Completion records and follow-up status can be shared with asset, warranty and billing systems through your integrations.

_Illustration: Skedulo card for JOB-4803, completed Wed at 5:21 PM, and its work going out with nothing to export: the job status to the Salesforce work order at 5:21 PM, the completed work to Finance for invoicing at 5:22 PM, and Gloria Benitez's approved hours, 7.25, to Workday on Thursday at 8:30 AM - 3 sent, each ticking green in turn._

## See how ADT Solar scaled appointment scheduling.

- **Before**
  - Manual scheduling across spreadsheets, emails, calls.
  - Reps limited to about 3 appointments a day.
- **With Skedulo**
  - Automated, optimized scheduling by tier and skill.
  - Reps can adjust schedules live from the field.
- **Outcome**
  - Average daily appointments doubled, from 3 to 6.
  - Booked appointments grew more than 1,000%.

> With Skedulo, we can play 5D chess! Our original goal of 800 appointments per week has grown to 1600 per day.… Before Skedulo we struggled to get 800! This is a growth of over 1000% even during the struggles of a global pandemic.
>
> — Kat Carroll, Program Manager, ADT Solar

- **1000%+** — growth in booked appointments, even through the pandemic

[Read Story](https://www.skedulo.com/customers/adt-solar/)

## Frequently Asked Questions

### Can Skedulo schedule EV charging technicians?

Yes. Recorded skills and certifications are matched to each job's requirements alongside availability and route fit. Access and equipment readiness can be tracked in configured fields on the job, and the responsible team confirms prerequisites before dispatch.

### What qualifications do EV charger technicians need, and can Skedulo track them?

Requirements depend on the work, jurisdiction, customer, and equipment manufacturer. Record relevant qualifications and expiry dates, then match them to job requirements. Your organization verifies credentials and any required crew composition.

### Can Skedulo support commissioning checklists?

Yes. Mobile forms capture commissioning checks, readings, photos, notes and signatures, and a form can be required before the job is marked complete. The record supports your review process but doesn't replace technical acceptance or required external approvals.

### Can commissioning wait until an inspection has cleared?

Yes. The inspection and commissioning visits can be linked with a job dependency, so commissioning is sequenced after the inspection it depends on. When the inspection slips, the scheduler sees which commissioning visit moves with it.

### Can Skedulo manage service work across distributed charger and storage sites?

Yes. Plan recurring visits and urgent requests using recorded qualifications, location, availability, and service windows. Review existing appointments before reallocating a technician.

### Can Skedulo connect asset data to warranty, billing, and monitoring systems?

Yes. Integrations and APIs connect field work with warranty, billing, charger or network management and monitoring systems. What's shared depends on the integration you configure, typically completion evidence and follow-up status.

_Keep Exploring_

## More for your energy service operation.

### Products

- [Skedulo Intelligence](https://www.skedulo.com/product/skedulo-intelligence/)
- [Field Scheduling](https://www.skedulo.com/product/field-scheduling/)
- [Forms & Checklists](https://www.skedulo.com/product/forms-checklists/)
- [Frontline Mobile App](https://www.skedulo.com/product/mobile/)
- [Workflow](https://www.skedulo.com/platform/workflow/)
- [Tempo](https://www.skedulo.com/product/tempo/)

### Energy & Solar Programs

- [Field Service, O&M & Inspections](https://www.skedulo.com/industries/energy-solar/field-service-om-inspections/)
- [Residential Solar Installation](https://www.skedulo.com/industries/energy-solar/residential-solar-installation/)
- [Commercial & Utility-Scale Solar](https://www.skedulo.com/industries/energy-solar/commercial-utility-scale-solar/)

### Use Cases

- [Installation](https://www.skedulo.com/use-cases/installation/)
- [Inspections & Forms](https://www.skedulo.com/use-cases/inspections-forms/)
- [Asset Management](https://www.skedulo.com/use-cases/asset-management/)
- [Task Management](https://www.skedulo.com/use-cases/task-management/)

## See Skedulo for storage and charging service.

We'll explore technician scheduling, commissioning records and integrations for the sites you support.

[Book a Demo](https://www.skedulo.com/book-a-demo/)
