Installation schedulingfor crews and projects.

Plan site visits around crew roles, equipment, access and appointment windows. Installers can use Mobile for drawings and instructions, then record commissioning results and outstanding work.

Trusted by teams that keep essential work moving.

Achieve3000
American Red Cross
Connexin
ECL Group
Mainmark
Rocket Fiber

//Tempo

Tempo, alongside installation coordinators.

Review upcoming installations, ask about missing requirements and prepare updates with Tempo. The records, actions and approvals available depend on your setup.

Permit missing

A required permit is still outstanding. Check the status with the responsible person before sending the crew.

//Crews, routes & milestones

Coordinate crews, equipment, and site windows.

Installation backlog

Separate ready installs, unassigned demand, and installs at risk of missing a promised date.

Skills & qualifications

Review skills, credentials, availability, and location against the installation requirements.

Crew composition

Schedule the required people, roles and equipment together, with the installation's recorded prerequisites available to planners.

Dates, routes & priorities

Balance promised dates, appointment windows, travel, duration, and business priority across the backlog.

Dispatch readiness

Review crew assignments, equipment requirements, and site details before releasing the work.

//Systems

Connect installation work with existing business systems.

Use integrations and APIs to bring in installation requests and share job status, results, and follow-up with connected systems.

CRM and project

Keep customer, project, and contract details connected to the installation outcome.

ERP and billing

Share completed-work and parts details to support approval and billing review.

Warranty and asset

Share installed equipment and serial details with connected asset or warranty systems.

Inventory

Exchange recorded parts and equipment usage or returns with inventory systems.

BI and data

Share work records for reporting and analysis.

//Analytics

Installation performance, from backlog to return visits.

Demand and readiness

Sold, ready, unassigned, and completed installs.

Scheduling and dispatch

Time to schedule, on-time arrival, and backlog age.

Travel and utilization

Productive time, travel time, and crew utilization.

Install quality

First-time completion, commissioning failures, and return visits.

Closeout

Evidence completeness, review time, and unresolved follow-up.

Connexin engineer working on a wall-mounted box outside a brick house at dusk, Connexin van behind

Bridge the office andthe field, in real time.

Connexin

“Making the move to Skedulo meant we could bridge that gap between the office and the field teams.”

Emily Halsey
Engineering Operations Manager, Connexin

Before

Manual processes and no visibility into engineering work until the end of the day.

With Skedulo

Live progress, handover notes, and photos as the work happens.

Outcome

Faster visibility, fewer end-of-day surprises, cleaner handover records.

Show us how your installations run.

Bring a typical installation or a rollout you're planning. We'll show you how Skedulo handles the crew requirements, scheduling and work on site.