

One schedule for every shift and critical task.
Plan production shifts alongside maintenance and quality work. Assign people with the required skills, share instructions on mobile, and record work as it’s completed.
Trusted by teams coordinating frontline work.

//Tempo
Tempo, alongside plant supervisors.
Review shift assignments, ask about outstanding maintenance and prepare staffing changes with Tempo. Available data, actions and approvals depend on your setup.
You- Line 2's conveyor drive bearing seized at 10:12 AM, mid-run on order 7718.
- JOB-4419 logged bearing noise on that drive on Monday; it was booked for Saturday's shutdown.
- Line 2's operators, Carol Ngresource and Bridget Hanleyresource, are idle until it restarts.
Line 2 is down mid-order. Let me find a maintenance technician who can lock out the drive and change the bearing soonest.
Kevin's tool change on Press 4 feeds Line 1. Marco can pause his lubrication round and reach Line 2 by 10:25 AM.
Who can fix the drive now
at Line 2 bySend Marco to Line 2's drive and move its operators to Line 3
What happens
Hi Carol, Marco Salazar is fixing Line 2's drive, restart about 11:30 AM. Can you and Bridget help on Line 3's changeover until then?
Yes, we're heading over to Line 3 now.
Marco is on Line 2's drive with the bearing reserved, and Carol and Bridget help on Line 3 until the restart.
Plan
iWaiting on contextDrafting a planProposed · waiting for youStarted 10:14 AM
Line 2
iNorthgate Plant · conveyor drive
Until the 4:00 PM truck
iRestart by 11:50 AM or the truck leaves short
New issue
Line 2 is down: its conveyor drive bearing seized
Downtime alert · Line 2 · just now
//Why this is hard
A full shift can still be missing a critical skill.
Headcount is only part of the plan. Each shift also needs the right skills for production, changeovers, quality checks, and work carried over from the previous team.
A filled roster can hide a skills gap
Enough people are scheduled, but a required operator qualification or task-specific skill is missing.
Changeovers need people and preparation
Switching products takes setup work, checks, and people who know the next job. Those assignments need to line up with the changeover.
Essential tasks need time in the shift
Quality checks, cleaning, and planned maintenance need qualified people and time alongside production work.
Filling one gap can create another
Moving an employee to cover an absence can leave another line or task short of the skills it needs to run.
Unfinished work crosses shifts
The incoming team needs to know which checks, repairs, and follow-up tasks are still open, and who’s responsible.
//Pulse Platform
Build plant workforce processes on our Pulse Platform.
Model your plant's roles, work areas, equipment and more on our Pulse Platform. Build applications and workflows for staffing, supporting tasks and shift reviews, connected to your production and maintenance systems.
System of record
Add fields or related objects for lines, work areas, equipment, qualifications, and more alongside work and people records.
Workflows and automation
Route unfinished work to the next shift's supervisor and assign follow-up through a configured workflow.
Integrations and APIs
Connect your manufacturing operation to ERP, MES, CMMS, QMS, and payroll systems. Use integrations and APIs to bring production and asset data into Skedulo and share coverage, completed work, and quality updates.
Experiences built around your business
Create a supervisor view of skill coverage and mobile forms for task results.
The Frontline Continuum
Represent workers, shifts, task assignments, and related plant records in a shared operational model.
How customers put Skedulo to work.
“We're able to make sound business decisions that better all parties involved...”
“For managers, daily dashboards give a helicopter view of what we have scheduled and...”
“Skedulo worked with us to create a customized solution that is truly plug-and-play...”
Let's look at your plant's staffing requirements.
Show us how production, maintenance and quality work share your teams. We'll walk through skill-based scheduling and task coordination in Skedulo.


