Schedule plant shifts, inspections, and repairs.
Coordinate plant coverage and mobile work across assets, locations, skills, and changing priorities.

Trusted by teams coordinating frontline work.





//Tempo
Review maintenance capacity with Tempo.
Compare technician assignments and prepare follow-up with Tempo. It uses the production and asset records and actions enabled for your team.
You- JOB-4466, Press 4's quarterly preventive maintenance, is due Friday and has no window booked.
- Press 4 stamps brackets for Line 1 on both shifts this week, and the work needs it locked out for 4 hours.
- The technician must be trained on press hydraulics and authorized for lockout/tagout.
Press 4 shouldn't run past Friday without its maintenance. Let me find four hours in its schedule and a hydraulics technician.
Nights have no hydraulics technician, and Wednesday would stop a run mid-shift. Thursday's die change already stops the press for two hours.
When Press 4 can be locked out
run time lostBook Press 4's maintenance into Thursday's die change, with Kevin
What happens
Hi Aaron, Press 4's maintenance is booked Thu 2:00 - 6:00 PM with the die change. The bracket run restarts at 6:00 PM.
Works for Line 1. We'll build extra brackets Wednesday.
Kevin does Press 4's maintenance in Thursday's die change, a day before it's due, losing only two hours of run time.
Plan
iWaiting on contextDrafting a planProposed · waiting for youStarted 7:33 AM
Press 4 maintenance
iQuarterly · 4 hours locked out
Press 4 on Thursday
iThe die change already stops the press for 2 hours
New issue
No window booked for Press 4's maintenance, due Friday
Maintenance at risk · JOB-4466 · just now
//Turn plant findings into scheduled work
Maintenance windows and open findings in view.
Arrange technicians, capture findings on mobile, and assign corrective work for review.
Preventive maintenance due dates
See preventive maintenance windows before they're overdue.
Quality findings and ownership
Turn a failed check into a tracked issue with an owner.
Technician qualifications
Schedule by skill, certification, and availability.
Mobile inspection records
Record checklist results, photos, readings, and signatures.
Assigned corrective work
Define follow-up tasks with responsible staff and due dates under your review process.

Give leaders the data to make sound decisions, fast.
“We're able to make sound business decisions that better all parties involved, that better our protectors, better our customers, better our company and our shareholders.”
Before
- Job acceptance confirmation and completed-work paperwork both moved through paper, phone calls, and manual entry.
- Job acceptance could take more than 6 hours to confirm, with timesheets and signatures processed separately afterward.
With Skedulo
- Jobs are entered, dispatched, and confirmed from one connected system.
- Status updates in real time as work is accepted and completed.
Outcome
- 50% less time to confirm job acceptance.
- Leaders make sound decisions from data captured at the point of work.
See Skedulo for plant maintenance and quality.
We'll work through technician planning, inspections and corrective actions alongside your plant systems.


